1.0.3 - Production
Firmware 5.342.30 for VCS has now been tested with this version
Release Topics
Release Schedule
| Field Trial | Production |
|---|---|
| 4 April 2025 | 4 April 2025 |
Resolved Issues
| ID | Description |
|---|---|
| 602531 | The wait time for transactions in recovery for device P630, caused by connection issues, was excessively long. Previously, it could have taken 10 minutes for a transaction to be cancelled, but after the fix, this time for recovery or cancellation was reduced to just 3 minutes. |
| 606125 | Fixed the issue where a user could not follow the recovery screen flow when a PED lost connection to switch to till, which could take 10 minutes to timeout. |